We are participating in the design of the first segmental bridge to be constructed in Greece. It will be located in Northern Greece. It contains 8 parts of continuous spans, with middle spans varying from 45m to 50m. The bridge deck will be formed as a box girder and it will be prestressed with external tendons.

Spherical bearings are selected for the connection of the deck with the piers providing increased seismic isolation. Deep foundation with shafts or pile groups will constitute the foundation of the bridge.