Viaduct
Participants
Owner : Hellenic Ministry of Infrastructure, Transport and Networks
Contractor : J/V ALPINE BAU GmbH – TERNA SA
Structural and geotechnical design : ODOTECHNIKI Ltd
Construction follow-up : ODOTECHNIKI Ltd
Location
Tripoli – Kalamata Highway, Section “Paradisia – Tsakona”, South Peloponnese, Greece
General Information
Function / usage : Highway bridge
Part of Tripoli-Kalamata Highway
Date of study : 2008
Date of construction : 2008-2010
Status : in use
Cost of construction : 8.300.000€
Geometry
Bridge total length : 492m
Number of spans : 14 spans
Spans length : 24,40m, 30,20m, 35,50m
Maximum pier height : 35,50m
Deck width for each branch : 11,00m
Foundation:
piles diameters : Φ100 – Φ120m
piles length : 11m – 25m
Materials
Structural Type : T-section girder bridge
Deck : Precast, post-tensioned concrete beams
Piers, abutments : reinforced concrete
Pile-caps : reinforced concrete
Piles : reinforced concrete
Quantities
Prestressed concrete : 6.900m3
Reinforced concrete : 27.450m3
Reinforced steel : 6.500t
Prestressed steel : 245t